H2S treatment at this Permian E&P meant high scavenger costs, constant supervision, and the ever-present risk of going off-spec at the sales point. Traditional fixed-rate injection treated for the worst case all the time, burning chemical on days the gas did not need it.
DC3 deployed Smart H2S automated scavenger control across the gathering system. The system doses proportionally against real production variables, adjusting treatment rates dynamically as conditions change.
Adaptive rate adjustment responds to process variables in real time. Pump performance monitoring eliminates guesswork and manual checks. Configurable alarms keep the team informed, and predictive upset prevention catches issues before they reach the sales point.
Over $3 million saved in H2S treating costs. Spec held at the sales point throughout, with dramatically less manual oversight required from the field team.
Tell us about your chemical program. Typical ROI is 3 days to 3 months.